您当前的位置:
首页 >
文章列表页 >
Reason Analysis and Preventive Measures for Jamming of Revolving Air Pre-heater
更新时间:2025-11-18
    • Reason Analysis and Preventive Measures for Jamming of Revolving Air Pre-heater

    • Vol. 37, Issue 3, Pages: 68-71(2017)
    • CLC: TM621
    • Published:2017

    移动端阅览

  • JIANG Sennian, LIU Zheng. Reason Analysis and Preventive Measures for Jamming of Revolving Air Pre-heater[J]. 2017, 37(3): 68-71. DOI:

  •  
  •  

0

Views

60

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Reason Analysis On Bursting for Over-temperheature of Boiler’s Superheater In Jin Zhushan Power Plant
Cause analysis and treatment of the unqualified gypsum produced by the FGD system in power plants
Analysis on TA abnormality of 220 kV cassette metal expander

Related Author

Huang Wei
TAO Li1
ZHOU Nian-guang1
ZHOU Yan-ming1
YANG Xiao-ling2
SUN Wei
FANG Yi-ping
CHEN Bo

Related Institution

湖南省电力试验研究所
Hunan Electric Power Corporation Research Institute
Hunan Xiangdian Test & Research Institute Co.,Ltd
Hunan Electric Power Corporation Maintenance Company
0