您当前的位置:
首页 >
文章列表页 >
Optimization of Coordinated Control for Thermal Power Unit with Primary Air Pressure Control Boiler Load
更新时间:2025-11-18
    • Optimization of Coordinated Control for Thermal Power Unit with Primary Air Pressure Control Boiler Load

    • Vol. 37, Issue 4, Pages: 15-17(2017)
    • CLC: TM621.2
    • Published:2017

    移动端阅览

  • ZOU Xiangjun, ZHANG Zaiming. Optimization of Coordinated Control for Thermal Power Unit with Primary Air Pressure Control Boiler Load[J]. 2017, 37(4): 15-17. DOI:

  •  
  •  

0

Views

67

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis and optimization of quality of inner cooling water in 362.5MW generators
Research on test of large steam turbine units optimal operation and economy analysis
Optimization and realization of protection logic of boiler tripping without turbine tripping for 600MW subcritical power unit
Analysis and optimization of incipient faulty prediction unit of large-sized oil-filled equipments in converter station
Design optimization of connecting pipe of condenser rear water chambers for large scale steam turbines

Related Author

ZHONG Lian
JIA Xiuying
ZHENG Wei-de
TUO Wen-qun
LI Ming
HUANG Pi-wei
JIAO Qing-feng
XU Shu

Related Institution

  华能湖南岳阳发电有限责任公司 湖南岳阳414002  
Huaneng Yueyang Power Generation co.,Ltd
  湖南省电力公司试验研究院 湖南长沙410007  
Hunan Electric Power Test and Research Institute
Datang Huaying Jinzhushang Thermal Power Branch Company,Lengshuijiang
0