a detailed investigation of an insulating rod breakdown failure during a 500 kV GIS operation is presented. By means of gas component inspection
disintegration inspection and test in the factory
the cause of the failure is determined that the metal powder generated by the friction between the insulating rod slot and the bearing contaminated the chamber