您当前的位置:
首页 >
文章列表页 >
Discussion of Installation Technology Upgrading of High-end Converter for ±1 100 kV Guquan Converter Station
更新时间:2025-11-18
    • Discussion of Installation Technology Upgrading of High-end Converter for ±1 100 kV Guquan Converter Station

    • Vol. 39, Issue 2, Pages: 72-75(2019)
    • CLC: TM40;TM721.1
    • Published:2019

    移动端阅览

  • JIANG Zidan, LIU Baohong, LIU Chao. Discussion of Installation Technology Upgrading of High-end Converter for ±1 100 kV Guquan Converter Station[J]. 2019, 39(2): 72-75. DOI:

  •  
  •  

0

Views

44

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation Study of Converter Transformer Loss in LCL-HVDC System
Method Difference of Putting the 800 kV Converter Transformer into Position between Electric Chain Hoist and Winch

Related Author

YANG Zhidong
NI Qing
LUO Longfu
赵子墨
王东
贺磊
肖哲

Related Institution

State Grid Corporation
Hunan University
Consulting Company
0