您当前的位置:
首页 >
文章列表页 >
Breakdown Analysis of a Test of Inductive Withstand Voltage for 500 kV Transformer
更新时间:2025-11-18
    • Breakdown Analysis of a Test of Inductive Withstand Voltage for 500 kV Transformer

    • Vol. 40, Issue 1, Pages: 36-40(2020)
    • CLC: TM407
    • Published:2020

    移动端阅览

  • LI Wei, ZHANG Jin, FU Jingsong, et al. Breakdown Analysis of a Test of Inductive Withstand Voltage for 500 kV Transformer[J]. 2020, 40(1): 36-40. DOI:

  •  
  •  

0

Views

39

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on surface electric field intensity for 500 kV transmission lines based on finite element method
Analysis and Solution Ideas on Current Operation and Maintenance Situation of Energy Storage Power Station on Grid Side in Hunan Power Grid

Related Author

LV Jian-hong
PENG Ji-wen
ZHOU Jian-fei
YANG Jin-chun
LI Tie-nan
YU Bin
XU Biao
ZHOU Ting

Related Institution

Hunan Electric Power Corporation Research Institute
State Grid Hunan Electric Power Company Limited Research Institute
State Grid Hunan Electric Power Company Limited
State Grid Hunan Integrated Energy Service Company Limited
0