Reactive Voltage Rapid Optimization Control of Doubly-Fed Wind Farm Based on Model Predictive Control
|更新时间:2025-11-18
|
Reactive Voltage Rapid Optimization Control of Doubly-Fed Wind Farm Based on Model Predictive Control
Vol. 42, Issue 2, Pages: 5-10(2022)
作者机构:
1. 湖南工业大学电气与信息工程学院
2. 国网湖南省电力有限公司电力科学研究院
作者简介:
基金信息:
DOI:
CLC:TM614
Published:2022
稿件说明:
移动端阅览
LI Shengqing, CHEN Xin, ZHENG Jian, et al. Reactive Voltage Rapid Optimization Control of Doubly-Fed Wind Farm Based on Model Predictive Control[J]. 2022, 42(2): 5-10.
DOI:
LI Shengqing, CHEN Xin, ZHENG Jian, et al. Reactive Voltage Rapid Optimization Control of Doubly-Fed Wind Farm Based on Model Predictive Control[J]. 2022, 42(2): 5-10.DOI:
Reactive Voltage Rapid Optimization Control of Doubly-Fed Wind Farm Based on Model Predictive Control
Aiming at the problem of reactive power control lag and poor voltage command following in single time section prediction information of wind farm
a reactive power and voltage control strategy of doubly fed wind farm based on model predictive control is proposed. The strategy aims at minimizing the deviation between the grid-connected point voltage and the terminal voltage of the wind farm. Firstly
the reactive power equipment output and load demand prediction information are calculated based on the time scale
and the reactive power voltage prediction control model is established. Secondly
more detailed prediction control points are divided in the control cycle
the prediction model is modified
and the dual system control instructions are coordinated and distributed in advance to effectively reduce the reaction time. When the wind speed fluctuates rapidly
the voltage control performance can be optimized and the tracking accuracy can be improved
so that the reactive power equipment can quickly compensate the reactive power to stabilize the voltage of the grid-connected point
and the dynamic reactive power capacity of the static var generator can be reasonably regulated to maximize the reactive power reserve. A doubly-fed wind farm model is established in MATLAB/Simulink for simulation. The results show that the proposed strategy can quickly coordinate the output of reactive power equipment
effectively reduce the reaction time
and enhance the rapid adjustment ability of reactive power in wind farms.