您当前的位置:
首页 >
文章列表页 >
A Dynamic Quantile Hyetograph-Based Flood Forecasting Method for Extending Flood Lead Time: A Case Study of the Jianshan and Hezikou Basins
更新时间:2026-10-08
    • A Dynamic Quantile Hyetograph-Based Flood Forecasting Method for Extending Flood Lead Time: A Case Study of the Jianshan and Hezikou Basins

    • PEARL RIVER   Pages: 1-16(2026)
    • Received:18 July 2026,

      Revised:2026-09-19,

      Accepted:20 September 2026,

      Online First:08 October 2026,

    移动端阅览

  • ZHANG Dawen,GAO Yudan,JIANG Ping.A Dynamic Quantile Hyetograph-Based Flood Forecasting Method for Extending Flood Lead Time: A Case Study of the Jianshan and Hezikou Basins[J].PEARL RIVER. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Runoff Prediction and Uncertainty Analysis for Xijiang River Basin Based on CMIP6 Climate Scenarios
Research on PRBP Neural Network Flood Forecasting Model in Chongyang River Basin
Research Progress on Risk Assessment and Management and Control of Dike Engineering Danger
An improved API-SCS-CN model based on flood classification and enhanced runoff-routing mechanisms
A Transformer-Based Flood Forecasting Method for Huanren Reservoir Integrating Satellite Remote Sensing Data

Related Author

ZHOU Shuai
YAN Meng
WU Huiming
CHEN Zhaoqing
LU Wangming
JIN Baoming
SI Qi
JIANG Shuihua

Related Institution

School of Water Conservancy and Hydroelectric Power, Hebei University of Engineering
Pearl River Water Resources Research Institute, Pearl River Water Resources Commission
Guangzhou Pearl Science Institute Engineering Survey and Design Co., Ltd.
Nanping Flood and Drought Disaster Prevention Center
College of Civil Engineering, Fuzhou University
0