您当前的位置:
首页 >
文章列表页 >
Study on the current status of digital and intelligent operation of European hydropower stations and its implications for China
更新时间:2026-10-06
    • Study on the current status of digital and intelligent operation of European hydropower stations and its implications for China

    • Vol. 0, Issue 3, (2026)
    • CLC: TV697
    • Online First:09 July 2026,

      Published:2026

    移动端阅览

  • YUAN Wenhan.

    Study on the current status of digital and intelligent operation of European hydropower stations and its implications for China
    [J]. 2026, 0(3). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

32

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of smart construction technology for roller-compacted concrete dams in large-scale hydropower projects
Study on key technical difficulties and countermeasures for anti-seepage curtain grouting of homogeneous earth dam foundations in deep-cut valley areas
Construction of online finite element analysis platform for CFRD of Tankeng hydropower station
Application of virtual monitoring points in safety monitoring information management systems
Study of early identification of geological hazard risks in reservoir areas using InSAR technology#br#

Related Author

No data

Related Institution

No data
0