您当前的位置:
首页 >
文章列表页 >
Analysis on the causes of abnormal abrupt changes in the measurements by the inverted plumb line of a concrete gravity dam
更新时间:2026-10-06
    • Analysis on the causes of abnormal abrupt changes in the measurements by the inverted plumb line of a concrete gravity dam

    • Vol. 0, Issue 3, (2026)
    • CLC: TV698.1
    • Online First:09 July 2026,

      Published:2026

    移动端阅览

  • LIU Peng, HUANG Yunhui.

    Analysis on the causes of abnormal abrupt changes in the measurements by the inverted plumb line of a concrete gravity dam
    [J]. 2026, 0(3). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

77

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study and analysis of drought warning water levels at Bashan reservoir
Study on the current status of digital and intelligent operation of European hydropower stations and its implications for China
Concept and method of full process monitoring of operational behavior of hydropower dams
Construction of online finite element analysis platform for CFRD of Tankeng hydropower station
Safety monitoring and analysis of the civil structure of the pumped storage units in the load rejection test#br#

Related Author

No data

Related Institution

No data
0