您当前的位置:
首页 >
文章列表页 >
Investment risk assessment and control measures of pumped-storage hydropower project
更新时间:2026-07-09
    • Investment risk assessment and control measures of pumped-storage hydropower project

    • Vol. 0, Issue 2, (2026)
    • CLC: TV743
    • Online First:03 July 2026,

      Published:2026

    移动端阅览

  • ZHONG Ping, ZOU Zhi. Investment risk assessment and control measures of pumped-storage hydropower project[J]. 2026, 0(2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

4

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Stability analysis and treatment of the ancient landslide on the left bank of spillway of Naba reser_ voir in Wangmo county
Application of frequency electromagnetic sounding method in detection of rock fracture zone in dam foundation
Study of parameter prediction of dam/embankment breach
Joint application of surface wave method and self-potential method in seepage analysis of core wall dam
A multi-objective optimization approach for joint regulation of hydropower stations integrating flood control and peak shaving objectives

Related Author

No data

Related Institution

No data
0