您当前的位置:
首页 >
文章列表页 >
Analysis of seepage causes for newly constructed bottom outlet and treatment
更新时间:2026-07-02
    • Analysis of seepage causes for newly constructed bottom outlet and treatment

    • Vol. 0, Issue 1, (2026)
    • CLC: TV54
    • Online First:11 March 2026,

      Published:11 March 2026

    移动端阅览

  • TANG Bangjun, HU Yan. Analysis of seepage causes for newly constructed bottom outlet and treatment[J]. 2026, 0(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

37

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis on seepage along the water conveyance system of Tianhuangping pumped storage power station
Exploration and practice of compilation of the core content of safety operation and regulation for large reservoirs
Robot for above-water and underwater inspection of concrete panel and its engineering applications#br#
Application of OCTEM and GRP to defect detection for rockfill dam with inclined clay core
Simulation and analysis of sandy embankment breach floods based on a two- dimensional sediment-water model

Related Author

LIN Zhi
ZHU Jin-jie

Related Institution

Large Dam Safety Supervision Center of State Electricity Regulatory Commission
0