Displacement superposition method of numerical analysis for determining influence of complex metro station construction on deformation of adjacent buildings
|更新时间:2026-06-25
|
Displacement superposition method of numerical analysis for determining influence of complex metro station construction on deformation of adjacent buildings
Vol. 35, Issue S2, (2014)
作者机构:
1. 山东大学 岩土与结构工程研究中心,济南,250061
2. 安徽省建筑科学研究设计院,合肥,230001
作者简介:
基金信息:
DOI:
CLC:U291.69
Online First:12 November 2014,
Published:2014
稿件说明:
移动端阅览
XU Bang-shu, DING Wang-tao, LIU Lin-jun, et al. Displacement superposition method of numerical analysis for determining influence of complex metro station construction on deformation of adjacent buildings[J]. 2014, 35(S2).
DOI:
XU Bang-shu, DING Wang-tao, LIU Lin-jun, et al. Displacement superposition method of numerical analysis for determining influence of complex metro station construction on deformation of adjacent buildings[J]. 2014, 35(S2).DOI:
Displacement superposition method of numerical analysis for determining influence of complex metro station construction on deformation of adjacent buildings
Space distribution of foundation pit engineering for metro transfer station
which consists of vertically crossed station excavation
connected aisle and running tunnel
is complex. Numerical simulation method is usually used to analyze the construction impact of pit on adjacent buildings. Because of complicated structure and large excavation size
it is difficult to establish an integrated model to simulate construction process with single microcomputer; and numerical method does not work smoothly due to a large number of grids. In the numerical simulation of Qianshan Road metro station in Hefei
in order to overcome this problem
the complex metro foundation pit is divided into global model and one local model. The ultimate results of global model will be exported as a result of initial displacement field in local model; and then the local model is further excavated to study the influence of pit construction on neighboring buildings. Taking inverse distance weighted method and elementary interpolation method for examples
two kinds of initial displacement field of local model will be obtained by these two approaches. The calculating results of two methods are compared. It is shown that the results obtained by using displacement superposition method
which is consistent with the ones obtained by calculating separately
can used as the results of overall model approximately. The feasibility of displacement superposition method is verified. Comparing the inverse distance weighted with the elementary interpolation method
the former has a higher precision than the latter. The results play a guiding role in numerical simulation of complex foundation pit engineering.
Coupling mechanism of seepage and heat transfer in rock fracture based on physics-informed neural networks
Influence of construction gap on the force of steel lining in compressed air storage cavern
Stability and failure mode analysis of tunnel face in composite ground with upper sand and lower clay layers
Characterization method for the three-dimensional soil cutting failure surface based on damage energy dissipation
Pullout simulation on fully grouted rock bolts based on residual shear strength
Related Author
WANG Zhi-liang1
XIAO Zhi-huan1
SHEN Lin-fang1
LI Shao-Jun2
ZHANG Gui-min
SUN Wen-qing
ZHU Ze-fan
SU Yong-kang
Related Institution
Faculty of Civil Engineering and Mechanics, Kunming University of Science and Technology
State Key Laboratory of Geomechanics and Geotechnical Engineering Safety, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Mechanics and Civil Engineering, China University of Mining and Technology
State Key Laboratory of Intelligent Construction and Healthy Operation and Maintenance of Deep Underground Engineering, China University of Mining and Technology