Stability analysis of close-located underground caverns based on tunnel lining and equivalent anchor bolt simulation
|更新时间:2026-06-25
|
Stability analysis of close-located underground caverns based on tunnel lining and equivalent anchor bolt simulation
Vol. 35, Issue S1, (2014)
作者机构:
1. 三峡大学 三峡库区地质灾害教育部重点实验室,湖北,宜昌,443002
2. 三峡大学 水利与环境学院,湖北,宜昌,443002
作者简介:
基金信息:
DOI:
CLC:U45
Online First:20 June 2014,
Published:2014
稿件说明:
移动端阅览
LIU Jie, TANG Liang, LI Jian-lin, et al. Stability analysis of close-located underground caverns based on tunnel lining and equivalent anchor bolt simulation[J]. 2014, 35(S1).
DOI:
LIU Jie, TANG Liang, LI Jian-lin, et al. Stability analysis of close-located underground caverns based on tunnel lining and equivalent anchor bolt simulation[J]. 2014, 35(S1).DOI:
Stability analysis of close-located underground caverns based on tunnel lining and equivalent anchor bolt simulation
Underground caverns of Jiangping River Hydropower Station arranged for the diversion tunnel
flood discharge tunnel
spillway No.1
spillway No.2 in turn
caverns of which are intensive
geological conditions are complex and constructions are difficult. The authors simulate caverns mainly in three-dimensional model; while simulate the three chambers slopes of the outlet
four large faults
the actual shape of a number of rock stratification and slope table accuratly. Prestressed anchor cable
anchor bolt and lining systems and other support measures are used in the project after excavation. The prestressed anchor bolt is simulated accuratly in supporting calculations. System of anchor bolts are simulated by using two-dimensional submodel for equivalent calculations. These measures ensure the necessary accuracy
but also improve the modeling and calculation efficiency. For the secondary lining simulation
the shell unit of three-dimensional shell structure is used to get revised deformation parameters of the initial lining and secondary lining considering the effect of anchor bolt lining through two displacement equivalent. Lining thickness has been optimized according to the deformation trends of the key points and the greatest moment change of cavern. Cavern bending moment and shear force value can be read though lining unit effectively. Bending and shear force values of lining structural of the most dangerous condition provide a reference for the reinforcement. The diagram of displacement values and the plastic zone map before and after the reinforcement are given in the calculation results. And the reinforcement measures significantly reduce the maximum displacements and the plastic zone.