您当前的位置:
首页 >
文章列表页 >
Risk control and dealing example of confined water of deep foundation pit
更新时间:2026-06-25
    • Risk control and dealing example of confined water of deep foundation pit

    • Vol. 35, Issue S1, (2014)
    • CLC: TU46.3
    • Online First:20 June 2014,

      Published:2014

    移动端阅览

  • XU Chang-jie, XU Li-ge, SUN Feng-ming, et al. Risk control and dealing example of confined water of deep foundation pit[J]. 2014, 35(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2201

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of piping sanding and flux of cohesionless soils
Study of practical design and calculation method for central island method
Mechanism study and finite element simulation of three-phase coupling seepage erosion piping
Critical water head determination of water gushing in foundation pit based on three-dimensional numerical analysis
Study of critical piping hydraulic gradient of suspended cut-off wall and sand gravel foundation under different stress states

Related Author

CHEN Jian-sheng
HE Hai-qing
WANG Shuang
ZENG Ming-ming
WANG Ting
HE Wen-zheng
GU Wen-tian
CHEN Min-hua

Related Institution

Geotechnical Research Institute, Hohai University
Shenzhen Research and Design Institute, China Academy of Railway Sciences
Key Laboratory of Soft Soils and Geoenviromental Engineering of Ministry of Education, Zhejiang University
Shanghai Geotechnical Engineering and Geology Institute Co. Ltd.
Shanghai Municipal Bureau of Planning and Land Resources
0