Monitoring and analysis of variation of anchor prestress in saturated silty sand condition
|更新时间:2026-06-25
|
Monitoring and analysis of variation of anchor prestress in saturated silty sand condition
Vol. 35, Issue S1, (2014)
作者机构:
1. 中国矿业大学(北京)力学与建筑工程学院,北京,100083
2. 北京现代金宇工程建设有限公司,北京,100102
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:20 June 2014,
Published:2014
稿件说明:
移动端阅览
LIU Bo, ZHANG Gong, ZHOU Hao-liang, et al. Monitoring and analysis of variation of anchor prestress in saturated silty sand condition[J]. 2014, 35(S1).
DOI:
LIU Bo, ZHANG Gong, ZHOU Hao-liang, et al. Monitoring and analysis of variation of anchor prestress in saturated silty sand condition[J]. 2014, 35(S1).DOI:
Monitoring and analysis of variation of anchor prestress in saturated silty sand condition
Prestress loss of anchor cable should not be neglected in engineering construction. The cause of prestress loss is usually related to engineering site condition. The saturated silty sand is more complicated and sensitive than other geological conditions
which is more likely to cause prestress loss. Through real-time monitoring of anchor prestress of a deep foundation pit in Langfang city
combining with the engineering environment
factors influencing on variation of anchor prestress are analyzed. The results show that the process of construction
tension and environmental factors affect the variation of prestress. The most obvious impact is the excavation process; and the maximum rate of variation of prestress value is 79.1%; instantaneous unloading causes values of prestress loss between 22.8% to 59.2%. The influence of construction process is most obvious. Experience for similar geological engineering construction is provided through the research and analysis of variation law of anchor prestress.