Theory of multi-bench retaining for large area foundation pit and its engineering application
|更新时间:2026-06-25
|
Theory of multi-bench retaining for large area foundation pit and its engineering application
Vol. 35, Issue S2, (2014)
作者机构:
天津大学 建筑工程学院,天津,300072
作者简介:
基金信息:
DOI:
CLC:TU470
Online First:12 November 2014,
Published:2014
稿件说明:
移动端阅览
ZHENG Gang, GUO Yi-bin, NIE Dong-qing, et al. Theory of multi-bench retaining for large area foundation pit and its engineering application[J]. 2014, 35(S2).
DOI:
ZHENG Gang, GUO Yi-bin, NIE Dong-qing, et al. Theory of multi-bench retaining for large area foundation pit and its engineering application[J]. 2014, 35(S2).DOI:
Theory of multi-bench retaining for large area foundation pit and its engineering application
When the horizontal reinforced concrete struts are used in retained foundation pit of large area,the cost of horizontal reinforced concrete struts will be very high and need long construction period. Moreover
large amount of solid waste will be produced after the struts been demolished. Therefore
the multi-bench retaining method is developed and was used in large area foundation pit projects. The failure mechanism of multi-bench retained foundation pit is investigated and design method is studied. The multi-bench retaining structure can fail as overall stability failure or overall overturning failure like a gravity retaining wall when the width of the bench is small. The slip surface can extend into the soil between retaining pile of different benches with the increase of the width of the bench
this leads to the mutual-effect between the multi-bench retaining piles. Separate failure can occur to the multi-bench retaining pile when the width of the bench is big enough. The application of multi-bench retaining method shows that multi-bench retained foundation pit with the use of horizontal reinforced concrete struts can be highly cost-effective and construction period of underground structure can be significantly reduced.