Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance
|更新时间:2026-06-25
|
Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance
Vol. 35, Issue S2, (2014)
作者机构:
1. 山东大学 岩土与结构工程研究中心,济南,250061
2. 北京城建设计发展集团股份有限公司,北京,100000
作者简介:
基金信息:
DOI:
CLC:U452
Online First:12 November 2014,
Published:2014
稿件说明:
移动端阅览
LI Shu-cai, LI Ke-xian, LEI Gang, et al. Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance[J]. 2014, 35(S2).
DOI:
LI Shu-cai, LI Ke-xian, LEI Gang, et al. Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance[J]. 2014, 35(S2).DOI:
Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance
Near blasting beneath the just completed primary support line is a special condition; it relates to many problems such as the primary support failure and subsidence. A design and construction example of an engineering of the Qingdao Metro Line 2 close (250 mm) beneath the just completed primary support line 3 tunnel
is employed
controlling vibration and deformation with measures such as the self-feeding pipe shed
tunneling crown
assisted middle hole cut
applied tensile force for the existing tunnel load
and reasonable blasting vibration control indexes are proposed according to analogy. The variation law of deformation and internal force of existing tunnel in building construction is revealed by using the finite element analysis software MIDAS-GTS for numerical analysis of 3D model. The measures taken achieve the desired effect. Primary support structure of the line 3 has no abnormal
through theoretical calculation and experimental analysis. Research results have an important reference value to blasting under special condition in design and construction.