Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel
|更新时间:2026-06-25
|
Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel
Vol. 35, Issue 8, (2014)
作者机构:
1. 同济大学 岩土及地下工程教育部重点实验室,上海,200092
2. 同济大学 地下建筑与工程系,上海,200092
3. 甬江隧道管理处,浙江,宁波,315800
作者简介:
基金信息:
DOI:
CLC:TU478
Online First:14 August 2014,
Published:2014
稿件说明:
移动端阅览
XIE Xiong-yao, WANG Pei, LI Yong-sheng, et al. Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel[J]. 2014, 35(8).
DOI:
XIE Xiong-yao, WANG Pei, LI Yong-sheng, et al. Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel[J]. 2014, 35(8).DOI:
Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel
is a 420 m long road immersed tunnel. It is on the soft soil foundation in a bend of Yongjiang River
which has caused large settlement. Moreover
the severe sediment deposition and 2.67m tidal range in Yongjiang River also have a great influence on the settlement of tunnel. Based on the monitoring data of settlement
the paper analyses the subsoil conditions
tide and desilting’s influence on settlement. And a finite element method based on fluid-solid coupling method is put forward to simulate the long term settlement
and the simulation results are in good agreement with the monitoring data. In addition
the key influencing factors of tunnel settlement
including subsoil condition
trench siltation and siltation and desilting above the element
are calculated and compared. The monitoring data and finite element analysis show that the subsoil condition is the main factor that determines the magnitude of settlement
and the settlement of tunnel on soft soil is much larger than that on other kind of foundations; because of the tidal range
tunnel is subject to an oscillation of elevation which may account for 4%~10% of settlement of operation period; the effect of silting on tunnel is obvious
but regular desilting can only decrease the settlement temporarily and cause the settlement cyclic variation. Although the monitoring data were obtained from a specific project
the conclusions of the study are sufficiently general and may apply in other immersed tunneling projects.
Monitoring and analysis of tunnel surface stability
Development of drill monitoring instrument for frozen soil settlement
Stress of large cylindrical caisson structure and its adjacent settlement
A multi-scale coupling finite element method based on the microscopic soil particle motions
Settlement and contact pressure characteristics of the main building and annex with post-cast strips on medium or low compressible soil
Related Author
JIA Jian-qing
WANG Hong-tu
LIU Da-peng
AN Long-qi
HU Ming-jian
WANG Ren
TAN shi-ling
SHI Xiang-feng
Related Institution
School of Traffic and Transportation, Lanzhou Jiaotong University
Key Laboratory for the Exploitation of Southwestern Resources & the Environmental Disaster Control Engineering, Ministry of Education, Chongqing University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
Hubei Seismic Bureau
School of Civil Engineering & Architecture, Hubei University of Technology