您当前的位置:
首页 >
文章列表页 >
Stress analysis of deep horseshoe tunnel considering support delay
更新时间:2026-06-25
    • Stress analysis of deep horseshoe tunnel considering support delay

    • Vol. 35, Issue S1, (2014)
    • CLC: U452
    • Online First:20 June 2014,

      Published:2014

    移动端阅览

  • Lü Ai-zhong, QIN Yuan, CHEN Hong-yu. Stress analysis of deep horseshoe tunnel considering support delay[J]. 2014, 35(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1635

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Stability analysis of an ellipsoidal cavity in foundation
Numerical simulation for tunnel of Hangzhou metro excavation on virtual site
Groundsill stress characteristics and structural deformation analysis of the west scriptures printing hall in the potala palace, tibet
Stability analysis and evaluation of large arch dam
Progressive fracture evolution and mechanical response of cavity-containing sandstone under low-frequency disturbance

Related Author

LIAO Li-ping
YANG Wan-ke
WANG Qi-zhi
DING Bo-yang
TAO Hai-bing
HE Man-chao
HAN Xue
LIU Cheng-yu

Related Institution

Department of Civil Engineering and Applied Mechanics, Sichuan University
Institute of Mountain Hazards and Environment, Chinese Academy of Sciences
Graduate University of Chinese Academy of Sciences
Institute of Protection Construction for Disaster, Zhejiang University of Technology
GIS Applied Technology Research Institute, Hangzhou Normal University
0