您当前的位置:
首页 >
文章列表页 >
Model test on pile-plank roadbed of high-speed railway overlying goafs
更新时间:2026-06-25
    • Model test on pile-plank roadbed of high-speed railway overlying goafs

    • Vol. 35, Issue 11, (2014)
    • CLC: TU473
    • Online First:10 December 2014,

      Published:2014

    移动端阅览

  • LI Chuan-bao, CHENG Qian-gong, LIANG Xin, et al. Model test on pile-plank roadbed of high-speed railway overlying goafs[J]. 2014, 35(11). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1598

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Model test on pile group foundation of a high-speed railway bridge above a goaf
Settlement calculation of pile foundation in deep-soft soil considering depth effect of compression modulus
Model test studies of collapse and settlement of tunnel in saturated soft rocks
Field test study of DX piles
Centrifuge test of new pile-plate structure embankment settlement of soft soil of high-speed railway

Related Author

LIANG Xin
CHENG Qian-gong
CHEN Jian-ming
LI Liang-guang
CHEN Fu-jiang
MA Jian-lin
ZHU Lin
YU Da-wei

Related Institution

Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University
Faculty of Civil Engineering, Guangxi University of Science and Technology
China Railway 19th Bureau Group Co., Ltd.
Southwest Jiaotong University
Department of Geotechnical Engineering, School of Civil Engineering, Southwest Jiaotong University
0