Theoretical solution of longitudinal upward movement of
underwater shield tunnel and its application
|更新时间:2026-06-25
|
Theoretical solution of longitudinal upward movement of
underwater shield tunnel and its application
Vol. 35, Issue 11, (2014)
作者机构:
1. 西南交通大学 土木工程学院,成都,610031
2. 河北交通职业技术学院 土木工程系,石家庄,050091
3. 石家庄铁道大学 土木工程学院,石家庄,050043
作者简介:
基金信息:
DOI:
CLC:U452
Online First:10 December 2014,
Published:2014
稿件说明:
移动端阅览
WANG Dao-yuan, YUAN Jin-xiu, ZHU Zheng-guo, et al. Theoretical solution of longitudinal upward movement of
underwater shield tunnel and its application[J]. 2014, 35(11).
DOI:
WANG Dao-yuan, YUAN Jin-xiu, ZHU Zheng-guo, et al. Theoretical solution of longitudinal upward movement of
underwater shield tunnel and its application[J]. 2014, 35(11).DOI:
Theoretical solution of longitudinal upward movement of
underwater shield tunnel and its application
Considering the factors of static buoyancy and dynamic buoyancy
time variation of grout and compression of the overburden soil
based on curved differential equation of elastic foundation beam
finite element theory
boundary conditions and the coordination equations for deformation
angle rotation
shear and bending moment
a theoretical solution for longitudinal upward movement of underwater shield tunnel is obtained. It was applied to comprehensive pipe Project of Caofeidian Industrial Zone Gallery known as ‘the 1st shield of Hebei. The computation example of engineering shows that the maximum error of theoretical solution and numerical solution is within 2.5%. Furthermore
the result obtained by the proposed theoretical solution is well consistent with the monitoring result of normal excavation section and can be used to analyze the longitudinal upward movement of shield tunnel. Moreover
the theoretical solution has got rid of the tedious process when numerical model established and unit refined
so it will be accepted more easily by constructers or designers
so as to provide some reference to perfect the related design specifications.