您当前的位置:
首页 >
文章列表页 >
Transfer bearing mechanism of thick composite roof in gob-side entry retaining
更新时间:2026-06-25
    • Transfer bearing mechanism of thick composite roof in gob-side entry retaining

    • Vol. 34, Issue S1, (2013)
    • CLC: TD322
    • Online First:09 June 2014,

      Published:2013

    移动端阅览

  • HAN Chang-liang, ZHANG Nong, YAO Ya-hu, et al. Transfer bearing mechanism of thick composite roof in gob-side entry retaining[J]. 2013, 34(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2281

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Backfill horizontal stability analysis of gob-side entry retaining with compound roof in deep mine
Mechanical analysis of stability of key blocks of overlying strata for gob-side entry retaining and calculating width of roadside backfill
Mechanisms of roadside support in gob-side entry retaining and its application
Analysis of supporting resistance of backfilling wall for gob-side entry retaining under typical roof conditions
Research on combined support technique of gob-side entry retaining

Related Author

YANG Sen
LIU Qin-jie
LI Ying-fu
HUA Xin-zhu
YANG Peng
HUA Xin-zhu
LI Ying-fu
ZHU Tao-lei

Related Institution

School of Energy and Safety, Anhui University of Science and Technology
Jiulishan Coalmining, Jiaozuo Coal Industrial (Group) Co.
State Key Laboratory of Coal Resources and Safe Mining, China University of Mining and Technology
School of Mines, China University of Mining and Technology
State Key Laboratory of Deep Coal Mining & Environment Protection, Huainan Mining Industry(Group) Co., Ltd.
0