A full-column shearing anchor bolt of discontinue deformation analysis for rock failure
|更新时间:2026-06-25
|
A full-column shearing anchor bolt of discontinue deformation analysis for rock failure
Vol. 35, Issue 1, (2014)
作者机构:
山东大学 岩土与结构工程研究中心,济南,250061
作者简介:
基金信息:
DOI:
CLC:TU452
Online First:14 January 2014,
Published:2014
稿件说明:
移动端阅览
CHEN Yun-juan, LI Shu-cai, ZHU Wei-shen, et al. A full-column shearing anchor bolt of discontinue deformation analysis for rock failure[J]. 2014, 35(1).
DOI:
CHEN Yun-juan, LI Shu-cai, ZHU Wei-shen, et al. A full-column shearing anchor bolt of discontinue deformation analysis for rock failure[J]. 2014, 35(1).DOI:
A full-column shearing anchor bolt of discontinue deformation analysis for rock failure
anchor bolt has been divided into two kinds: end anchorage mode and full-column anchorage mode. As an important anchor bolt type of engineering support
full-column anchorage bolt has a broad application prospect. Only the end anchorage bolt is used in discontinuous deformation analysis (DDA)
and its extended procedure DDARF method
while
the axial role of bolt is considered and the lateral limit of the bolt’s anchor force to rock masses is ignored. In order to better understand the bolt support mechanism
and to consider the shear effect of bolt
a new bolt form of DDARF is put forward—full-column shearing anchor bolt. The surrounding rock’s stability of a highway tunnel is analyzed with this improved full-column shearing anchor bolt
the results are compared with that of end support anchor bolt; and show that
this full-column shearing anchor bolt is effective
and has better anchorage effect than end anchorage support.