Design of structure inbuilt displacement measurement system in geomechanical model test and its application
|更新时间:2026-06-25
|
Design of structure inbuilt displacement measurement system in geomechanical model test and its application
Vol. 35, Issue 3, (2014)
作者机构:
1. 四川大学 水力学与山区河流开发保护国家重点实验室,成都,610065
2. 四川大学 水利水电学院,成都,610065
3. 成都市政工程设计研究院,成都,610015
作者简介:
基金信息:
DOI:
CLC:P554
Online First:19 March 2014,
Published:2014
稿件说明:
移动端阅览
YANG Geng-xin, MA De-ping, ZHANG Lin, et al. Design of structure inbuilt displacement measurement system in geomechanical model test and its application[J]. 2014, 35(3).
DOI:
YANG Geng-xin, MA De-ping, ZHANG Lin, et al. Design of structure inbuilt displacement measurement system in geomechanical model test and its application[J]. 2014, 35(3).DOI:
Design of structure inbuilt displacement measurement system in geomechanical model test and its application
In high arch dam abutment stability geomechanical model test
the relative displacement of weak structural plane is the important reference to determine dam abutment instability and analyze whole dam abutment safety degree. But the current measuring instruments
such as resistance strain gage
surface displacement meter just can measure the strain of dam body and displacement of surface dam abutment; for the relative displacement of weak structural plane which in dam abutment is difficult to obtain. So in light of this problem
based on the resistance strain gage technology
a new type of inbuilt displacement system has been developed and installed on the structural planes to obtain the relative displacement of structure. This system are composed by signal acquisition instrument
Wheatstone bridge and displacement sensor. In model test
strain changing process is got using the inbuilt displacement system; and displacement value is got through the strain-displacement curve. In integral stability geomechanical model test of Jinping high arch dam
installing this system in weak structural plane
the relative displacement is obtained efficiently during the loading process. Comparing with the strain and the abutment surface displacement monitoring results
the feasibility of inbuilt displacement system is proved. The results can provide reliable data to determine the overall stability of the dam and foundation.