您当前的位置:
首页 >
文章列表页 >
Research on construction displacement of north anchorage caisson of parrot cay Yangtze River bridges in Wuhan
更新时间:2026-06-25
    • Research on construction displacement of north anchorage caisson of parrot cay Yangtze River bridges in Wuhan

    • Vol. 34, Issue S1, (2013)
    • CLC: U443
    • Online First:09 June 2014,

      Published:2013

    移动端阅览

  • DENG You-sheng, XIONG Hao, LIU Rong, et al. Research on construction displacement of north anchorage caisson of parrot cay Yangtze River bridges in Wuhan[J]. 2013, 34(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1865

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

FEM of traffic-load-induced settlement of road on soft clay
Application of UH model to finite element analysis
Analysis of influence of metro tunnel construction on adjacent buildings
Stress of large cylindrical caisson structure and its adjacent settlement
Model test and mechanical properties study of reinforced earth retaining wall

Related Author

WEI Xing
WANG Gang
YU Zhi-ling
YAO Yang-ping
FENG Xing
HUANG Xiang
LI Chun-liang
JIANG Xin-liang

Related Institution

Department of Geotechnical Engineering, Southwest Jiaotong University
Ertan Hydropower Development Engineering Company Ltd.
Southwest Reconnoiter & Design Institute Company Ltd. of Nuclear Industry
School of Transportation Science and Engineering, Beihang University
School of Civil Engineering, Tianjin University
0