Behavior of a high steep loess slope strengthened by combination system of soil nails and stabilization piles
|更新时间:2026-06-25
|
Behavior of a high steep loess slope strengthened by combination system of soil nails and stabilization piles
Vol. 35, Issue 7, (2014)
作者机构:
1. 西南交通大学 地质工程系,成都,610031
2. 中铁第四勘察设计院集团有限公司,武汉,430063
作者简介:
基金信息:
DOI:
CLC:TU444
Online First:11 July 2014,
Published:2014
稿件说明:
移动端阅览
WU Jiu-jiang, CHENG Qian-gong, MENG Xiang-long. Behavior of a high steep loess slope strengthened by combination system of soil nails and stabilization piles[J]. 2014, 35(7).
DOI:
WU Jiu-jiang, CHENG Qian-gong, MENG Xiang-long. Behavior of a high steep loess slope strengthened by combination system of soil nails and stabilization piles[J]. 2014, 35(7).DOI:
Behavior of a high steep loess slope strengthened by combination system of soil nails and stabilization piles
The combination of soil nails and stabilization piles (CSNSP) has been widely used as a reinforcing technique to retain excavations and stabilize slopes
but few relevant applications are found for high loess slope. Based on a high steep loess slope strengthened by CSNSP
the behavior of the strengthening system is investigated by field monitoring and finite element method. The results show that the lateral displacement
shear force and bending moment of piles increase gradually with the increment of excavation depth; and the displacement tends to be steady gradually. The location of the maximum shear force in the pile body shows a declining trend which indicates that the potential failure surface develops downwards. The distribution of soil pressure around piles in CSNSP system is compared with which appeared in deep foundation pit. The soil pressure on the back side of piles shows a trend of decrease with excavation while the soil pressure on the front side appears to be fluctuant. With the growth of excavation depth
the measured stress of the reinforced soil nails increases significantly
which indicates that the slope deformation is limited by the soil nails. The most dangerous rupture surface of the slope above piles appears to be a circular arc and the shear opening locates at the head of the piles. In addition
the proportion of soil nails to stability for the overall system is larger than the stabilization piles when the excavation depth is shallow
but the situation changes with the increment of the excavation depth.