A duration prediction model of surface thawing settlement in construction period of tunnel with horizontal freezing method
|更新时间:2026-06-25
|
A duration prediction model of surface thawing settlement in construction period of tunnel with horizontal freezing method
Vol. 35, Issue 2, (2014)
作者机构:
1. 安徽理工大学 土木建筑学院,安徽,淮南,232001
2. 中南大学 土木工程学院,长沙,410075
作者简介:
基金信息:
DOI:
CLC:U45
Online First:18 February 2014,
Published:2014
稿件说明:
移动端阅览
CAI Hai-bing, PENG Li-min, ZHENG Teng-long. A duration prediction model of surface thawing settlement in construction period of tunnel with horizontal freezing method[J]. 2014, 35(2).
DOI:
CAI Hai-bing, PENG Li-min, ZHENG Teng-long. A duration prediction model of surface thawing settlement in construction period of tunnel with horizontal freezing method[J]. 2014, 35(2).DOI:
A duration prediction model of surface thawing settlement in construction period of tunnel with horizontal freezing method
Artificially frozen wall is a temporary support structure in tunnel freezing engineering; and frozen wall will gradually thaw after construction of the tunnel lining. In the process of frozen wall thawing
thawing settlement of ground can produce serious influence on the surrounding environment. So a reasonable method must be established for predicting surface thawing settlement. On this basis
suitable thawing settlement prevention measures can be determined in the actual construction. For this reason
considering the thawing process of frozen wall
using stochastic medium theory
a duration prediction model of surface thawing settlement in the period of tunnel construction with horizontal freezing method is presented. Temperature field under natural thawing conditions can be approximately analyzed by flat-panel thawing theory; based on flat-panel thawing theory and thawing settlement content calculation formula in one-dimensional case
value methods of thaw front radius and thaw compression region inner radius are determined in the duration prediction model. The prediction method is applied to circular tunnel full section horizontal freezing engineering
surface thawing settlement variations with thawing time are presented. The results show that surface thawing settlement grows faster in the early stages of thawing
and grows slower in the later stages of thawing. Surface thawing settlement variations with thawing time is presented
which is consistent with thawing settlement characteristics of natural permafrost researched through test method by ЦЫТОВНИЧ.