您当前的位置:
首页 >
文章列表页 >
Research on advantage-fracture grouting mechanism and controlled grouting method in water-rich fault zone
更新时间:2026-06-25
    • Research on advantage-fracture grouting mechanism and controlled grouting method in water-rich fault zone

    • Vol. 35, Issue 3, (2014)
    • CLC: TU457.5
    • Online First:19 March 2014,

      Published:2014

    移动端阅览

  • LI Shu-cai, ZHANG Wei-jie, ZHANG Qing-song, et al. Research on advantage-fracture grouting mechanism and controlled grouting method in water-rich fault zone[J]. 2014, 35(3). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1738

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay
Strength development model for slurry-like mud treated by physicochemical combined method considering preloading stress
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule
Optimal design of lining structure in artificial cavern of compressed air energy storage
Anti-erosion mechanisms of microbially induced calcium carbonate precipitation-vegetation synergistic slope protection

Related Author

No data

Related Institution

No data
0