Research on consolidation settlement of ground surface caused by shield tunnelling
|更新时间:2026-06-25
|
Research on consolidation settlement of ground surface caused by shield tunnelling
Vol. 34, Issue S1, (2013)
作者机构:
1. 昆明理工大学 建筑工程学院,昆明,650051
2. 同济大学 土木工程学院,上海,200092
3. 云南大学 城市建设与管理学院,昆明,650091
作者简介:
基金信息:
DOI:
CLC:U452
Online First:09 June 2014,
Published:2013
稿件说明:
移动端阅览
WANG Zhi-liang, LIU Ming, XIE Jian-bin, et al. Research on consolidation settlement of ground surface caused by shield tunnelling[J]. 2013, 34(S1).
DOI:
WANG Zhi-liang, LIU Ming, XIE Jian-bin, et al. Research on consolidation settlement of ground surface caused by shield tunnelling[J]. 2013, 34(S1).DOI:
Research on consolidation settlement of ground surface caused by shield tunnelling
Regarding the soil around the tunnel as homogeneous
continuous
isotropic
saturated and elastic medium
the conformal mapping method is applied to transform the considered region in the physical plane into concentric ring region in the image. The control equation for dissipation of excess pore water pressure is established based on Terzaghi-Rendulic theory of two-dimensional consolidation when the lining is impermeable. The analytical solution for dissipation of excess pore water pressure is obtained using separation variables method; and the formula for consolidation settlement is got according to the theory of elasticity. Combined with an example
consolidation settlement of ground surface is discussed considering disturbance degree of soil
soil’s coefficient of permeability
soil’s modulus of elasticity and the depth of tunnel. The results show that there is a proportional relationship between the added value of consolidation settlement and the variation of initial excess pore water pressure in the outside of tunnel. And the greater the disturbance degree is
the larger the consolidation settlement is. The greater the coefficient of permeability is
the faster the consolidation settlement is. There is no relationship between the coefficient of permeability and the final value of consolidation settlement. The larger the modulus of elasticity is
the larger the final value of consolidation settlement is. The deeper the tunnel is
the longer the time of consolidation settlement is
and the larger the final value of consolidation settlement is.
Back-filled grouts diffusion model and its pressure to segments of shield tunnel
Study of field monitoring on interaction between twin slurry shield tunnels in close space
Study of field monitoring on interaction between twin slurry shield tunnels in close space
Analytical solution for dissipation of excess pore water pressure and soil consolidation settlement induced by tunneling under the influence of long-term leakage
Shield construction influences on piles and classification of adjacent pile degree
Related Author
YE Fei
ZHU He-hua
HE Chuan
LIN Zhi
ZHU He-hua
XIA Cai-chu
LIN Zhi1
ZHU He-hua2
Related Institution
Shaanxi Provincial Major Laboratory for Highway Bridge & Tunnel, Chang’an University
Department of Underground Engineering, Southwest Jiaotong University
Lab. of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai
Chongqing Communications Research & Design Institute, Chongqing 4000067
Department of Geotechnical Engineering, Tongji University