Experimental study of forming process of replacement pier in soft soil using dynamic replacement method
|更新时间:2026-06-25
|
Experimental study of forming process of replacement pier in soft soil using dynamic replacement method
Vol. 35, Issue 1, (2014)
作者机构:
1. 宁波大学 教育部冲击与安全工程重点实验室,浙江,宁波,315211
2. 浙江大学 滨海和城市岩土工程研究中心,杭州,310058
3. 宁波大学 机械工程与力学学院,浙江,宁波,315211
作者简介:
基金信息:
DOI:
CLC:TU411
Online First:14 January 2014,
Published:2014
稿件说明:
移动端阅览
ZHENG Ling-wei, ZHOU Feng-hua. Experimental study of forming process of replacement pier in soft soil using dynamic replacement method[J]. 2014, 35(1).
DOI:
ZHENG Ling-wei, ZHOU Feng-hua. Experimental study of forming process of replacement pier in soft soil using dynamic replacement method[J]. 2014, 35(1).DOI:
Experimental study of forming process of replacement pier in soft soil using dynamic replacement method
the length and the subsidence of the replacement pier need to meet the design specifications. The times of tampings and the fillings to fulfill a DR process is generally determined by field test. Understanding the forming mechanism of the replacement pier
and quantifying the factors such as energy releasing time
motion characteristics of fillers
stress of pounder bottom
etc
play critical roles for optimizing the DR process. In this paper
a model test method to study the interactions of the fillers and soil under the multiple impacts of the pounder is established. Experimental rusults show that each acceleration-time curve in DR can be divided into four stages
representing different phases of the soil-fillers motions under each pounding. Through analyzing the force-displacement (F-s) curves of the pounder in this process
the characteristics of each F-s curve are distinguished and the intrinsic mechanism is discussed. It was shown that with the increasing of filling times
the energy releasing time during each pounding decreases and the maximal force increases
signifying the gradual forming of the replacement pier in the soft soil foundation.
Sealing system design and model testing of lining structures for artificial underground gas storage caverns in medium-hard rock strata
Calculation method of sliding surface stress based on segmented sliding surface stress measurement system
Experimental study on vacuum combined with electro-osmosis for reinforcing ultrafine particle dredged soil
Experimental study on drainage performance of reinforced improved soft rock residual soil under rainfall conditions
Model test of deformation and failure mechanism of gravel soil bank slope under rainfall and reservoir water level
Related Author
CAO Xiao-yong
LIU Rui-hui
LI Jian-fei
YE Xin-xin
GENG Jun-yang
TAN Hai-xing
CHEN Huai-lin
YANG Tao
Related Institution
School of Highway, Chang’an University
CCCC First Highway Consultants Co., Ltd.
State Key Laboratory of Intelligent Construction and Maintenance for Geotechnical and Tunnel Engineering under Extreme Environments, Southwest Jiaotong University
China Northwest Research Institute Co., Ltd., of CREC