Model test research on work performance of steel tubular composite pile with shear ring, drilling mud skin and anticorrosion coating
|更新时间:2026-06-25
|
Model test research on work performance of steel tubular composite pile with shear ring, drilling mud skin and anticorrosion coating
Vol. 35, Issue 2, (2014)
作者机构:
1. 西南交通大学 土木工程学院,成都,610031
2. 港珠澳大桥管理局,广东,珠海,519015
3. 中交公路规划设计有限公司,北京,100088
作者简介:
基金信息:
DOI:
CLC:TU473.1
Online First:18 February 2014,
Published:2014
稿件说明:
移动端阅览
ZHANG Min, MA Jian-lin, SU Quan-ke, et al. Model test research on work performance of steel tubular composite pile with shear ring, drilling mud skin and anticorrosion coating[J]. 2014, 35(2).
DOI:
ZHANG Min, MA Jian-lin, SU Quan-ke, et al. Model test research on work performance of steel tubular composite pile with shear ring, drilling mud skin and anticorrosion coating[J]. 2014, 35(2).DOI:
Model test research on work performance of steel tubular composite pile with shear ring, drilling mud skin and anticorrosion coating
drilling mud skin and anticorrosion coating on performances of steel tubular composite (STC) piles
five model tests with different combinations of shear ring
drilling mud skin and anticorrosion coating are conducted; two of them are with shear ring
relying on the construction of the Hong Kong-Zhuhai-Macao Bridge. The load-deformation curves and deformations of cross-section
steel tube and shear ring have been compared and analyzed. The results obtained from the tests show that the bond strength of STC pile is reduced by drilling mud skin and anticorrosion coating
while the performances of steel tube are improved by shear ring. The cross-section deformation of pile shows "inverted v" or "m" type; it no longer meets section deformation assumption of classical mechanics. The disadvantage effects of drilling mud skin and anticorrosion coating can be completely overcome by the shear ring
when its spacing is less than 2D (D is pile’s diameter). Based on the test results
the stiffness calculation of STC pile has been discussed and the stiffness calculation formula in elastic stage has been given. The stiffness of STC pile is reduced by drilling mud skin with thickness of 0.1 mm and anticorrosion coating
which is improved by shear ring. The paper will provide references for STC pile’s design.
Sealing system design and model testing of lining structures for artificial underground gas storage caverns in medium-hard rock strata
Calculation method of sliding surface stress based on segmented sliding surface stress measurement system
Experimental study on vacuum combined with electro-osmosis for reinforcing ultrafine particle dredged soil
Experimental study on drainage performance of reinforced improved soft rock residual soil under rainfall conditions
Model test of deformation and failure mechanism of gravel soil bank slope under rainfall and reservoir water level
Related Author
CAO Xiao-yong
LIU Rui-hui
LI Jian-fei
YE Xin-xin
GENG Jun-yang
TAN Hai-xing
CHEN Huai-lin
YANG Tao
Related Institution
School of Highway, Chang’an University
CCCC First Highway Consultants Co., Ltd.
State Key Laboratory of Intelligent Construction and Maintenance for Geotechnical and Tunnel Engineering under Extreme Environments, Southwest Jiaotong University
China Northwest Research Institute Co., Ltd., of CREC