您当前的位置:
首页 >
文章列表页 >
Numerical simulation for cutoff wall under backfilling construction of Daning reservoir
更新时间:2026-06-25
    • Numerical simulation for cutoff wall under backfilling construction of Daning reservoir

    • Vol. 34, Issue 6, (2013)
    • CLC: O241
    • Online First:14 June 2013,

      Published:2013

    移动端阅览

  • LIU Guang-ming、 YUAN Hong-hu、 HUANG Wei-hong、 LIU Miao、 WANG Zhi-yin、. Numerical simulation for cutoff wall under backfilling construction of Daning reservoir[J]. 2013, 34(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1475

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Design of simulation experiment and its application system of outburst in uncovering coal seam in cross-cut
Analysis of effect of canyon terrain on stress and displacement of cutoff wall in dam foundation with deep overburden
Effect of dynamic compaction vibration on cutoff wall and its safety monitoring
Fluid migration modeling of CO2 injection in deep saline aquifers -A case study of the Sanzhao Depression, Songliao Basin
Simulation of post-installation residual stress in preformed piles based on energy conservation

Related Author

SU Cai-quan
SUN Lu-lu
ZHANG Qing-tao
CHENG Wei-min
WANG Gang
CAO Xue-xing
ZHOU Xiao-xi
HE Yun-long

Related Institution

Lindong Mining Group Co., Ltd.
College of Resources and Environmental Engineering, Shandong University of Science and Technology
Key Laboratory of Mining Disaster Prevention and Control of Ministry of Education, Shandong University of Science and Technology
HydroChina Corporation
Central and Southern China Municipal Engineering Design & Research Institute Co., Ltd.
0