Numerical simulation for cutoff wall under backfilling construction of Daning reservoir
|更新时间:2026-06-25
|
Numerical simulation for cutoff wall under backfilling construction of Daning reservoir
Vol. 34, Issue 6, (2013)
作者机构:
北京市南水北调工程建设委员会办公室,北京,100036
作者简介:
基金信息:
DOI:
CLC:O241
Online First:14 June 2013,
Published:2013
稿件说明:
移动端阅览
LIU Guang-ming、 YUAN Hong-hu、 HUANG Wei-hong、 LIU Miao、 WANG Zhi-yin、. Numerical simulation for cutoff wall under backfilling construction of Daning reservoir[J]. 2013, 34(6).
DOI:
LIU Guang-ming、 YUAN Hong-hu、 HUANG Wei-hong、 LIU Miao、 WANG Zhi-yin、. Numerical simulation for cutoff wall under backfilling construction of Daning reservoir[J]. 2013, 34(6).DOI:
Numerical simulation for cutoff wall under backfilling construction of Daning reservoir
There is a large terrain gap to some sections of cut-off wall for Daning reservoir
on both sides of wall and the top of lower wall
which affected by construction significantly
need a large amount of backfill soil. A three-dimensional numerical simulation is adopted based on experiment and monitoring data to analysis the effect of backfilling construction. The interaction between cutoff wall and backfilled soil is considered in the simulation. The stresses and deformations of the wall forms affected by different distances and contact are analyzed; the distribution of internal deformation and stress along the construction proceeding is obtained at the same time. The analysis shows that the upper wall tilts toward inside of reservoir
and the maximum principal stress appears at top of transfer position of the two walls. The inclination of the lower wall is very small and its maximum principal stress appears at the bottom of guide wall. No tensile stress exists in the lower wall. The stress and deformation of the wall have some variances along the wall
and the greatest change presents at the corner. The simulation results are comparatively close with the monitoring results.