您当前的位置:
首页 >
文章列表页 >
Analysis of dynamic stress concentration factor for existing circular tunnel lining under blasting seismic wave
更新时间:2026-06-25
    • Analysis of dynamic stress concentration factor for existing circular tunnel lining under blasting seismic wave

    • Vol. 34, Issue 8, (2013)
    • CLC: U452
    • Online First:13 August 2013,

      Published:2013

    移动端阅览

  • LI Xing-hua, LONG Yuan, JI Chong, et al. Analysis of dynamic stress concentration factor for existing circular tunnel lining under blasting seismic wave[J]. 2013, 34(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1585

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of mechanical model of fully grouted rock bolt’s anchorage interface in tunnel surrounding rock
Experimental research on tunnel health criterion of deficiency in lining thickness
SHPB test on blasting damage protection of tunnel surrounding rock
Review of research on instability failure mechanism and stability control of tunnel surrounding rock in water-bearing sandy ground
Random analysis of tunnel lining with interval finite element method

Related Author

WEN Jing-zhou、 ZHANG Yong-xing、 WANG Cheng、
CHEN Hong-kai
LI Ming
ZHANG Zhi-cheng
PU Chuan-jin
GONG Quan-mei
GUO Xue-bin
DAI Ren-ping

Related Institution

Key Laboratory of New Technology for Construction of Cities in Mountain Area, Ministry of Education, Chongqing University
School of Civil Engineering, Chongqing University
Institute of Geotechnical Engineering, Chongqing Jiaotong University
School of Civi1 Engineering, Southwest Jiaotong University
School of Environment and Resources, Southwest University of Science and Technology
0