Experimental study of bolt and cable truss system for large cross-section coal roadways under high stress
|更新时间:2026-06-25
|
Experimental study of bolt and cable truss system for large cross-section coal roadways under high stress
Vol. 33, Issue S2, (2012)
作者机构:
中国矿业大学(北京)资源与安全工程学院,北京,100083
作者简介:
基金信息:
DOI:
CLC:TD53
Online First:11 December 2012,
Published:2012
稿件说明:
移动端阅览
YAN Hong, HE Fu-lian, XU Teng-fei, et al. Experimental study of bolt and cable truss system for large cross-section coal roadways under high stress[J]. 2012, 33(S2).
DOI:
YAN Hong, HE Fu-lian, XU Teng-fei, et al. Experimental study of bolt and cable truss system for large cross-section coal roadways under high stress[J]. 2012, 33(S2).DOI:
Experimental study of bolt and cable truss system for large cross-section coal roadways under high stress
The surrounding rock controlling technology of large cross-section coal roadways under high stress in tectonic region is one of the problems to be desiderated to solve in coal mines. Aiming at the large deformation of the typical complex coal roadway in Xinsan coal mine of Fengfeng Company
in combination with the field observation and numerical simulation analysis integrated the results of large-section coal roadway under high stress deformation and failure characteristics
and then a type of surrounding rock controlling system called high strength bolt and cable truss is proposed on the basis of the core structure “cable and arch”. The basic structure
design process and prestress distribution characters of roof strata with the controlling system are analyzed. A field test is done on replacement coal roadway for filling waste gangue. Research results show that supporting structures of the new style system are stable; and the surrounding rock of the roadway is controlled well
which has theoretical and practical value to the supporting technology of analogous complex roadways.