您当前的位置:
首页 >
文章列表页 >
Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station
更新时间:2026-06-25
    • Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station

    • Vol. 33, Issue S2, (2012)
    • CLC: TV554
    • Online First:11 December 2012,

      Published:2012

    移动端阅览

  • HUANG Zhi-peng, DONG Yan-jun, LIAO Nian-chun, et al. Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station[J]. 2012, 33(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1923

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A study of stability and reinforcing measures of high slope in left abutment of Hongjiadu hydropower station
Reflection on the problems in mechanical response monitoring and testing design of deep tunnels
Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Anti-seismic stability analysis of entrance and high slope of water tunnel for a nuclear power plant
Discussion on frictional resistance problems and application experiment of yielding anchor cable in high slope support

Related Author

YANG Jian
CHEN Zu-yu
ZHANG Chuan-qing
GAO Yang
LIU Ning
ZHOU Hui
FENG Xia-ting
HOU Xiao-kun

Related Institution

China Institute of Water Resources and Hydropower Research
中国水利水电科学研究院岩土所
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
University of Chinese Academy of Sciences
HydroChina, Huadong Engineering Corporation
0