Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station
|更新时间:2026-06-25
|
Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station
Vol. 33, Issue S2, (2012)
作者机构:
1. 长江科学院 水利部岩土力学与工程重点实验室,武汉,430010
2. 锦屏建设管理局 锦屏一级安全监测管理中心, 锦屏,四川,615000
3. 中国水电工程顾问集团公司 中南勘测设计研究院,长沙,410014
4. 锦屏建设管理局 二滩水电建设开发有限公司,成都,610021
作者简介:
基金信息:
DOI:
CLC:TV554
Online First:11 December 2012,
Published:2012
稿件说明:
移动端阅览
HUANG Zhi-peng, DONG Yan-jun, LIAO Nian-chun, et al. Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station[J]. 2012, 33(S2).
DOI:
HUANG Zhi-peng, DONG Yan-jun, LIAO Nian-chun, et al. Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station[J]. 2012, 33(S2).DOI:
Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station
The excavation height of left slopes at Jinping I hydropower station is 530 m; faults and deep fracture were developed
unloading range is deep; and its geological conditions is complicated. Slope stability problems are important especially in the construction and operation. The engineering monitoring geological conditions of the slope is analyzed; deformation monitoring layout for the slope is described. The deformation monitoring system of the slope consists of surface deformation observation
shallow deformation observation and deep deformation observation. In three levels
monitorings of the slope deformation are made. For the surface deformation monitoring the geodetical surveying method is used; for the shallow deformation observation the multi-point displacement meters are used; the monitoring depth is 0-90 m; for the deep deformation observation the flat hole ranging
level survey and graphite convergence meters methods
etc
are used installed in exploration flat hole
through the main fault and deep crack
the biggest monitoring depth reach 260 m. By May 2011
monitoring data indicate that the maximum horizontal displacement in surface and shallow is 106.1 mm; the maximum settlement is 58.6 mm; which are controlled by excavation and supporting; the maximum horizontal displacement in deep is 47.48 mm; the maximum settlement is 7.2 mm
controlled by faults and deep fractures. The displacement tends to converge
the maximum deformation rate is 0.1 mm/d; and it meets the designed safety standards