Influences of shield advance rate and abnormal machine halt on tunnelling-induced ground surface settlements
更新时间:2026-06-25
    • Influences of shield advance rate and abnormal machine halt on tunnelling-induced ground surface settlements

    • Vol. 33, Issue 8, (2012)
    • CLC: TU47
    • Online First:13 August 2012,

      Published:2012

    移动端阅览

  • LIN Cun-gang. Influences of shield advance rate and abnormal machine halt on tunnelling-induced ground surface settlements[J]. 2012, 33(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2416

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Shield construction influences on piles and classification of adjacent pile degree
Research on calculation of post-construction transverse surface settlement caused by shield tunneling
Series solution to one-dimensional consolidation in unsaturated soils based on the homology analysis method
Research on consolidation settlement of ground surface caused by shield tunnelling
Research on distribution of initial excess pore water pressure due to shield tunnelling

Related Author

WANG Li-feng
YANG Ze-fei
WEI Gang
LIN Lei-lei
ZHANG Shi-min
LI Ji-wei
WANG Hua-bin
ZHANG Ling

Related Institution

Architectural Engineering Institute of Zhejiang University of Science and Technology
Department of Civil Engineering, Zhejiang University City College
College of Civil Engineering and Mechanics, Huazhong University of Science and Technology
Institute of Geotechnical and Underground Engineering, Huazhong University of Science and Technology
Faculty of Civil and Architectural Engineering, Kunming University of Science and Technology
0