Applied analysis of advanced detection for containing water body ahead of tunnel by transient electromagnetic method
|更新时间:2026-06-25
|
Applied analysis of advanced detection for containing water body ahead of tunnel by transient electromagnetic method
Vol. 33, Issue 9, (2012)
作者机构:
1. 同济大学 土木工程学院,上海,200092
2. 安徽理工大学 地球与环境学院,安徽,淮南,232001
作者简介:
基金信息:
DOI:
CLC:TU411
Online First:12 September 2012,
Published:2012
稿件说明:
移动端阅览
ZHANG Ping-song, LI Yong-sheng, HU Xiong-wu. Applied analysis of advanced detection for containing water body ahead of tunnel by transient electromagnetic method[J]. 2012, 33(9).
DOI:
ZHANG Ping-song, LI Yong-sheng, HU Xiong-wu. Applied analysis of advanced detection for containing water body ahead of tunnel by transient electromagnetic method[J]. 2012, 33(9).DOI:
Applied analysis of advanced detection for containing water body ahead of tunnel by transient electromagnetic method
The containing water body is one of the primary factors to impact the safety in production all the time. The transient electromagnetic method plays an important role on the advanced detection of water disaster in tunnel. Because of the detecting particularity in full space condition of tunnel
the detecting and forecasting results are often affected by the layout way of detection
and it often expresses in serial fields such as the interference factor rejection
depth calculation of resistivity
space judgment for abnormality
and so on. For acquiring more reliable detecting results
the testing arrangement is improved in the article. The detecting section in the direction of centre line is added
and it forms the detection method of four-section ahead of tunnel with the roof section
along tunnel section
and bottom floor section. The judging ability of space for the containing water body ahead of tunnel is enhanced. Through contrasting the results of the convention detecting pattern
the advantage of four-section method for geology body judgment is analyzed because of its combining cross-section and longitudinal section. The detecting practices show that it is reliable to use under 10 ?•m as the criteria of the resistivity to forecast the low resistivity field in the tunnel along the 6 coal seams for the advanced detection by the four-section transient electromagnetic method. It has important instructing value for driving safety of tunnel.