您当前的位置:
首页 >
文章列表页 >
Approximation method of tunnel longitudinal seismic analysis
更新时间:2026-06-25
    • Approximation method of tunnel longitudinal seismic analysis

    • Vol. 33, Issue 7, (2012)
    • CLC: U451
    • Online First:13 July 2012,

      Published:2012

    移动端阅览

  • ZHANG Bin-wei, YAN Song-hong, YANG Yong-dong. Approximation method of tunnel longitudinal seismic analysis[J]. 2012, 33(7). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1822

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of supporting effect of systematic bolts applied to weak and broken phyllite tunnels in meizoseismal area
Study of site monitoring of vertical full displacement of vault surrounding rock of tunnels and its change law
Research on comprehensive information intelligent monitoring system for tunnel excavation
Theoretical analysis model of deformation behavior of tunnel linings subjected to fire load
Study of deformation and failure mechanism and reinforcement effect of Yangpoli tunnel longitudinally traversing landslide

Related Author

ZOU Yu-lin
HE Chuan
ZHOU Y
WANG Bo
XU Jin-hua
LI You-yun、 ZHANG Zhi-geng、 XIE Yong-li、 LIU Bao-jian、
GAO Wen-xue
HOU Bing-hui

Related Institution

Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University
Sichuan Expressway Construction and Development Corporation
Key Laboratory for Special Area Highway Engineering of Ministry of Education, Chang’an University
College of Civil Engineering, Beijing University of Technology
Beijing Roads and Bridges Construction Group Co., Ltd.
0