Study of immersion collapsible characteristics under overburden pressure of Western Henan loess along Zhengzhou-Xi'an high-speed railway
|更新时间:2026-06-25
|
Study of immersion collapsible characteristics under overburden pressure of Western Henan loess along Zhengzhou-Xi'an high-speed railway
Vol. 33, Issue 6, (2012)
作者机构:
1. 兰州大学 土木工程与力学学院,兰州,730000
2. 中铁西北科学研究院有限公司,兰州,730000
3. 浙江大学 宁波理工学院,宁波,315100
作者简介:
基金信息:
DOI:
CLC:TU444
Online First:14 June 2012,
Published:2012
稿件说明:
移动端阅览
WU Xiao-peng, XIONG Zhi-wen, WANG Xiao-jun, et al. Study of immersion collapsible characteristics under overburden pressure of Western Henan loess along Zhengzhou-Xi'an high-speed railway[J]. 2012, 33(6).
DOI:
WU Xiao-peng, XIONG Zhi-wen, WANG Xiao-jun, et al. Study of immersion collapsible characteristics under overburden pressure of Western Henan loess along Zhengzhou-Xi'an high-speed railway[J]. 2012, 33(6).DOI:
Study of immersion collapsible characteristics under overburden pressure of Western Henan loess along Zhengzhou-Xi'an high-speed railway
This paper makes a study of the collapsible characteristics under overburden pressure of the Western Henan loess along Zhengzhou-Xi'an high-speed railway by field experiment. The developing process in the depth of loess collapsibility under overburden pressure and the collapsible horizontal distance have also been analyzed. The results show that: the influence of soaking boundary on collapse is very clear; but collapsible rate shows a slow-fast-slow-until-stable tendency
with 60% of the total settlement immersed for 10 days and 90% for 30 days. The of the site is 1.30
greater than the recommended 0.9 by the code. The results show that the extent of collapsibility of this region is more intense than that of general knowledge. In the site
loess collapse under overburden pressure maximum depth laboratory test value is 19 m; and field test value is 16 m
the former is 1.2 times the latter. The collapsible horizontal distance out of the test pit is 20 m
similar with the diameter of the test pit. Therefore
no water should be kept within 20 m from the embankment toe. The research results have been applied to the Zhengzhou-Xi'an high-speed railway construction
and can be taken as reference for similar projects in this region.