您当前的位置:
首页 >
文章列表页 >
Research on stress and settlement of super-large open caisson during first lifts
更新时间:2026-06-25
    • Research on stress and settlement of super-large open caisson during first lifts

    • Vol. 33, Issue 7, (2012)
    • CLC: TU473.2
    • Online First:13 July 2012,

      Published:2012

    移动端阅览

  • ZHU Jian-min, GONG Wei-ming, MU Bao-gang, et al. Research on stress and settlement of super-large open caisson during first lifts[J]. 2012, 33(7). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1746

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of earth pressure and settlement of culvert on soft foundation by 3-D FEM
Model test and mechanical properties study of reinforced earth retaining wall
Study on influence of stability of gently inclined stope roof based on dimensional analysis
Study of distribution law of earth pressure acting on shield tunnel lining based on in-situ data
Settlement and contact pressure characteristics of the main building and annex with post-cast strips on medium or low compressible soil

Related Author

CHEN Cun-li
HU Zai-qiang
LI Hong-ru
MA Jun-feng
LI Li-hua
SHI An-ning
XIAO Heng-lin
HU Zhi

Related Institution

Institute of Geotechnical Engineering, Xi’an University of Technology
Hubei Ecological Road Engineering Research Center, School of Civil Engineering, Architecture and Environment, Hubei University of Technology
School of Resources and Environmental Engineering, Wuhan University of Science and Technology
Hubei Key Laboratory for Efficient Utilization and Agglomeration of Met Allergic Mineral Resource, Wuhan University of Science and Technology
The Key Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University
0