Experimental study of high embankment culvert treated by imperfect ditch covered with a geogrid layer
|更新时间:2026-06-25
|
Experimental study of high embankment culvert treated by imperfect ditch covered with a geogrid layer
Vol. 33, Issue 8, (2012)
作者机构:
1. 湖北工业大学 土木工程与建筑学院,武汉,430068
2. 华中科技大学 岩土与地下工程研究所,武汉,430074
作者简介:
基金信息:
DOI:
CLC:TU43
Online First:13 August 2012,
Published:2012
稿件说明:
移动端阅览
MA Qiang, ZHENG Jun-jie, ZHANG Jun. Experimental study of high embankment culvert treated by imperfect ditch covered with a geogrid layer[J]. 2012, 33(8).
DOI:
MA Qiang, ZHENG Jun-jie, ZHANG Jun. Experimental study of high embankment culvert treated by imperfect ditch covered with a geogrid layer[J]. 2012, 33(8).DOI:
Experimental study of high embankment culvert treated by imperfect ditch covered with a geogrid layer
Based on the culvert-filling collaborative working mechanism
load reduction mechanism of culvert treated by imperfect ditch covered with geogrid is analyzed. A field experiment on a high embankment culvert treated by an imperfect ditch covered with geogrid is conducted to study the variations of vertical earth pressure on the crown of the culvert and on the surfaces below and above the geogrid. The distributions of earth pressures on the crown of the culvert and on the geogrid
as well as the coefficients of earth pressure are studied. The results show that the vertical earth pressure can be efficiently reduced by the imperfect ditch covered with geogrid
the vertical earth pressure is reduced by the “membrane effect” of geogrid and the frictions on the surfaces between the central soil prism and the lateral soil prisms
which transfer the vertical pressure from the central prism to the lateral prisms. Its load reduction efficiency is closely related to the height of the load reduction ditch
and a higher ditch results in a lower vertical earth pressure.