您当前的位置:
首页 >
文章列表页 >
Influence of construction sequence of cast-in-place group piles with steel sleeve on tunnels
更新时间:2026-06-25
    • Influence of construction sequence of cast-in-place group piles with steel sleeve on tunnels

    • Vol. 33, Issue 8, (2012)
    • CLC: TU443
    • Online First:13 August 2012,

      Published:2012

    移动端阅览

  • SONG Fu-gui, WANG Bing-long, HUANG Da-wei, et al. Influence of construction sequence of cast-in-place group piles with steel sleeve on tunnels[J]. 2012, 33(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1872

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on plugging effect of jacked prestressed concrete pipe pile
Finite element analysis of axial bearing capacity behavior of pile foundation in calcareous sediments
Analysis of pile driving effect of precast tubular pile using cylindrical cavity expansion theory
Anti-erosion mechanisms of microbially induced calcium carbonate precipitation-vegetation synergistic slope protection
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule

Related Author

ZHANG Zhong-miao
LIU Jun-wei
YU Feng
XIE Zhi-zhuan
PENG Fang-le
GAO Wei
KIYOSUMI Makoto
OHUCHI Masatoshi

Related Institution

Key Laboratory of Soft Soils and Geoenvironmrnt Engineering of Ministry of Education, Zhejiang University
School of Civil Engineering and Architecture, Zhejiang Sci-Tech University
Department of Geotechnical Engineering, Tongji University
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
Technical Development Division, Shiraishi Corporation
0