Model experiments on anti-detonating performance of tunnel entrance using pipe roof reinforcement
|更新时间:2026-06-25
|
Model experiments on anti-detonating performance of tunnel entrance using pipe roof reinforcement
Vol. 33, Issue 11, (2012)
作者机构:
1. 解放军理工大学 国防工程学院,南京,210007
2. 解放军72464部队,济南,250022
作者简介:
基金信息:
DOI:
CLC:TU93
Online First:14 November 2012,
Published:2012
稿件说明:
移动端阅览
XU Hong-fa, TONG Quan, WANG Guang-jian, et al. Model experiments on anti-detonating performance of tunnel entrance using pipe roof reinforcement[J]. 2012, 33(11).
DOI:
XU Hong-fa, TONG Quan, WANG Guang-jian, et al. Model experiments on anti-detonating performance of tunnel entrance using pipe roof reinforcement[J]. 2012, 33(11).DOI:
Model experiments on anti-detonating performance of tunnel entrance using pipe roof reinforcement
It is very important for protective design of tunnel entrance that assessing anti-detonating performance of surrounding rock using pipe roof reinforcement. Based on principle of similarity simulation
nature or grouting rockmass and steel pipe were replaced using cement soil of different cement-mixing ratios and plastic pipe respectively. Using the model tests
anti-detonating performance of tunnel entrance reinforced with pipe roof under explosive load was simulated. Length
width and height of three models are 2 m
2.2 m and 2 m respectively. The dynamic response and failure characteristic on tunnel entrance reinforced with none
one layer and three layers pipe roof were simulated using the three models respectively under direct explosion in the model top. Experiments show that the pipe roof supporting can reinforce surrounding rock effectively
enhance integrity and make the distributions of stress more reasonable; the entrance failure decreases significantly with the increase of pipe roof layer
such as failure range from 1.55 m to 0.45 m
the maximum main crack width from 25 mm to 3 mm
the maximum netty crack width from 24 mm to 0.3 mm
the crack number from 14 to 3 in the arch crown of tunnel
and the blasting pit volume from 0.12 m3 to 0.05 m3 in the model top. The pipe roof advance support can control effectively explosion damage outside the pipe roof reinforced layer.