Optimization of construction scheme of tunnel collapse and treatment effect
|更新时间:2026-06-25
|
Optimization of construction scheme of tunnel collapse and treatment effect
Vol. 32, Issue S2, (2011)
作者机构:
1. 中国矿业大学 深部岩土力学与地下工程国家重点实验室,江苏,徐州,221008
2. 中国矿业大学 力学与建筑工程学院,江苏,徐州,221008
3. 浙江大学 建筑工程学院,杭州,310058
作者简介:
基金信息:
DOI:
CLC:TU454
Online First:26 August 2011,
Published:2011
稿件说明:
移动端阅览
WANG Ying-chao, SHANG Yue-quan, JING Hong-wen, et al. Optimization of construction scheme of tunnel collapse and treatment effect[J]. 2011, 32(S2).
DOI:
WANG Ying-chao, SHANG Yue-quan, JING Hong-wen, et al. Optimization of construction scheme of tunnel collapse and treatment effect[J]. 2011, 32(S2).DOI:
Optimization of construction scheme of tunnel collapse and treatment effect
it is important to select appropriate construction scheme. Based on the engineering condition of tunnel collapse in Wuzhuling
two different construction schemes are simulated by the nonlinear finite element method. Compared with annular drift method
double-side-drift method can better control the displacements of surrounding rock
improve the force status of surrounding rock
decrease the force of primary support and make the range of plastic zone smaller. Therefore
double-side-drift method is more suitable for tunnel collapse treatment. Then
the analysis of site monitoring measurement shows that convergence displacement and vault crown settlement tend to stable condition quickly and the deformation value is smaller. The subject of tunnel is in stable state and has no deformation. It is shown that the treatment effect of double-side-drift method which is selected to through tunnel collapse is significant.