Loading experimental research of rock-anchored beam of JinpingⅠhydropowerstation underground powerhouse
|更新时间:2026-06-25
|
Loading experimental research of rock-anchored beam of JinpingⅠhydropowerstation underground powerhouse
Vol. 32, Issue S1, (2011)
作者机构:
1. 长江科学院 水利部岩土力学与工程重点实验室,武汉,430010
2. 长江科学院 重庆岩基研究中心,重庆,400014
3. 锦屏建设管理局 锦屏一级安全监测管理中心,四川 锦屏,610021
4. 二滩水电建设开发有限公司 锦屏建设管理局,成都,610021
5. 中国水电工程顾问集团公司 中南勘测设计研究院,长沙,410014
作者简介:
基金信息:
DOI:
CLC:TU452
Online First:16 May 2011,
Published:2011
稿件说明:
移动端阅览
HUANG Zhi-peng, ZHOU Jiang-ping, XU Ai-ping, et al. Loading experimental research of rock-anchored beam of JinpingⅠhydropowerstation underground powerhouse[J]. 2011, 32(S1).
DOI:
HUANG Zhi-peng, ZHOU Jiang-ping, XU Ai-ping, et al. Loading experimental research of rock-anchored beam of JinpingⅠhydropowerstation underground powerhouse[J]. 2011, 32(S1).DOI:
Loading experimental research of rock-anchored beam of JinpingⅠhydropowerstation underground powerhouse
safety monitoring method and results of rock-anchored beam in Jinping I hydropower station underground powerhouse
are introduced. The results show that anchor stress
crack openings
rock deformation and anchoring load losses are caused by secondary stress; their increments caused by test loads is far less than monitoring physical quantities; most of the anchor bolts stresses are tensiles. C anchor stress increment reflects more sensitive than A
B anchor stress increments; anchor stress increment diminishes quickly with the buried depth increases; during the whole process
all levels of load variation monitoring physical quantities are less than their design control standard values. It is suggested that the rock anchor beam design and construction should consider surrounding rock and rock anchor beam jointed effects in surrounding rock deformation.