您当前的位置:
首页 >
文章列表页 >
Study of construction method of tunnel in shallow broken rock mass
更新时间:2026-06-25
    • Study of construction method of tunnel in shallow broken rock mass

    • Vol. 32, Issue S2, (2011)
    • CLC: U452.2
    • Online First:26 August 2011,

      Published:2011

    移动端阅览

  • QIAO Chun-jiang, CHEN Wei-zhong, WANG Hui, et al. Study of construction method of tunnel in shallow broken rock mass[J]. 2011, 32(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

905

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research progress in pressure-relief mining
Seismic dynamic response analysis of breakwater under traveling wave excitations
Research on constitutive model of Jinping marble under unloading conditions and numerical simulation
Study of influence of formation conditions on construction process rules of ultralarge section and weak broken wall rock tunnel by numerical simulation
Research on numerical simulation of rock breaking using TBM disc cutters based on UDEC method

Related Author

CHENG Xian-gen
WANG Xiao-guang
WANG Hong-xing
LI Jun-ping
JIN Xian-long
YU Ke-qin
WANG Huan-huan
YANG Xun

Related Institution

College of Materials and Mineral Resources, Xi’an University of Architecture and Technology
上海核工程研究设计院
上海交通大学 机械与动力工程学院
上海交通大学 机械系统与振动国家重点实验室
School of Urban Construction, Yangtze University
0