您当前的位置:
首页 >
文章列表页 >
Design and in-situ testing analysis of contact pressure for large-area thick raft foundation under multi-tower buildings
更新时间:2026-06-25
    • Design and in-situ testing analysis of contact pressure for large-area thick raft foundation under multi-tower buildings

    • Vol. 32, Issue S2, (2011)
    • CLC: TU471
    • Online First:26 August 2011,

      Published:2011

    移动端阅览

  • GONG Jian-fei, ZHU Hong-bo, SHI Jin-long, et al. Design and in-situ testing analysis of contact pressure for large-area thick raft foundation under multi-tower buildings[J]. 2011, 32(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1954

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Measurement and analysis about coefficient of earth pressure at rest in alluvium of the Yellow river
Experimental research on ground improvement of silt using impact roller compaction
Investigation of physico-mechanical properties for highly weathered granite of nuclear power station in coastal site of western Guangdong province
Analysis and material selection of reinforced geosynthetics in sea dike project
Experimental study of earthquake liquefaction of saturated silt in Tianjin area

Related Author

HAN Shuai
WANG Dan
WANG Rong
LU Lin-hai
CAO Zheng-long
WANG Guo-fu
DING Tian-rui
XIAO Yuan-yuan

Related Institution

Shandong Provincial Geo-mineral Engineering Exploration Institute
Jinan Rail Transit Group Co., Ltd.
Huai’an Airport Construction Headquarters, Huai’an
Shanghai CAAC New Era Airport Design & Research Institute Co., Ltd.
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
0