Study of determining permeability coefficient in water inrush numerical calculation of subsea tunnel
|更新时间:2026-06-25
|
Study of determining permeability coefficient in water inrush numerical calculation of subsea tunnel
Vol. 33, Issue 5, (2012)
作者机构:
1. 山东大学 岩土与结构工程研究中心,济南,250061
2. 青岛市地下铁道公司,山东,青岛,266071
3. 中国矿业大学 深部岩土力学与地下工程国家重点实验室,江苏,徐州,221008
作者简介:
基金信息:
DOI:
CLC:U614
Online First:14 May 2012,
Published:2012
稿件说明:
移动端阅览
LI Shu-cai, ZHAO Yan, XU Bang-shu, et al. Study of determining permeability coefficient in water inrush numerical calculation of subsea tunnel[J]. 2012, 33(5).
DOI:
LI Shu-cai, ZHAO Yan, XU Bang-shu, et al. Study of determining permeability coefficient in water inrush numerical calculation of subsea tunnel[J]. 2012, 33(5).DOI:
Study of determining permeability coefficient in water inrush numerical calculation of subsea tunnel
The construction of subsea tunnel is high risky and water inrush is one of the main risk sources. If water inrush into the tunnel
it will have an important influence on the safety of construction as well as the control of operation cost after the subsea tunnel is completed. So making water inrush forecast is very important in the construction phase. Numerical analysis is the most popular method used in the prediction of water inrush at present
of which ascertaining the permeability coefficient is one key problem. Taking Qingdao Jiaozhouwan Subsea Tunnel as the project background
this paper deals with water inrush forecast during the subsea tunnel construction period by comprehensive usage of numerical computation
model test and local monitoring data analysis. Firstly
variation curves of the water inrush are got by monitoring the water inrush after tunnel excavation. Then numerical method is used to calculate the water inrush. During the process of calculating
parameters are adjusted constantly to fit the curve successfully. The permeability coefficient obtained is reasonable; it should be used in the numerical computation. Combined with the model geology
the relationship between the reasonable permeability coefficient and the permeability coefficient which is got from geological packer test in the early stage is obtained by comparison. Then model test is used to verify above conclusions. Finally
the conclusions can be used to other sections of subsea tunnel to make water inrush forecast. The result has significance for practice reference.
Derivation and validation of the motion equation for seepage in unsaturated soils
Study of the coupling model of rock elastoplastic stress-seepage-damage (Ⅰ) : Modelling and its numerical solution procedure
Research on multiple chemical grouting experiment of porous sandstone
Experiment study of fractal feature and relationship between fractal dimension and permeability coefficient of gravelly soil in debris flow source area
Experimental study of permeability characteristics of backfill paste mixed with unclassified tailings and waste rock
Related Author
SHAO Long-tan
SUN Yan-pu
DONG Hao
WANG Jun-xiang
JIANG An-nan
SONG Zhan-ping
QIAN Zi-wei
CAO Li-wen
Related Institution
Department of Engineering Mechanics, Dalian University of Technology
State Key Laboratory of Structural Analysis, Optimization and CAE Software for Industrial Equipment, Dalian University of Technology
Institute of Road and Bridge Engineering, Dalian Maritime University
College of Civil Engineering, Xi’an University of Architecture and Technology
State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining and Technology