Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel
|更新时间:2026-06-25
|
Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel
Vol. 32, Issue 10, (2011)
作者机构:
中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉,430071
作者简介:
基金信息:
DOI:
CLC:O319.56
Online First:13 October 2011,
Published:2011
稿件说明:
移动端阅览
XIAO Ya-xun FENG Xia-ting CHEN Bing-rui FENG Guang-liang ZHANG Zhao-tai MING Hua-jun. Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel[J]. 2011, 32(10).
DOI:
XIAO Ya-xun FENG Xia-ting CHEN Bing-rui FENG Guang-liang ZHANG Zhao-tai MING Hua-jun. Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel[J]. 2011, 32(10).DOI:
Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel
Tunnel boring machine(TBM) should face the risk of very strong rockburst directly in intact and brittle rock mass section with ultrahigh stress concentration for full-face excavation in deep tunnel; then safety of equipment and personnel will be under great threat. The excavation test through “part-pilot heading + TBM” is carried out in the diversion tunnel #3 of the Jinping II hydropower station and the rockburst risk of TBM part-pilot excavation is researched via real-time microsesimic monitoring. The results show that: (1) The daily number of microseismic events
the daily accumulative radiated seismic energy
number of big events and frequency and strength of rockburst in the field during part-pilot excavation are far lower than in the period of full-face advance. (2) The time domain evolution of logarithm of energy index and accumulative apparent volume indicates that the risk of strong rockburst in part-pilot section is smaller; and the excavation in field also proved this. (3) In comparison to full-face advance
the degree of concentration
number
magnitude and radiated energy of microseismic events in space in section of part-pilot are far lower. Therefore
the rockburst risk of TBM for part-pilot driving is more less than for full-face advance. In very strong rockburst section
when construction condition is indispensable
the part-pilot can be excavated in advance and then TBM pass
the risk of rockburst can be controlled availably.
Analysis of rockburst mechanism for deep tunnel based on moment tensor
Reflection on the problems in mechanical response monitoring and testing design of deep tunnels
Study of precursor information recognition and multiparameter early warning before rockburst of island fully mechanized caving face
Research on disaster monitoring of overburden ground pressure and surface subsidence in extra-large mined-out area
Strength development model for slurry-like mud treated by physicochemical combined method considering preloading stress
Related Author
MING Hua-jun
FENG Xia-ting
CHEN Bing-rui
ZHANG Chuan-qing
ZHANG Chuan-qing
GAO Yang
LIU Ning
ZHOU Hui
Related Institution
HydroChina, Huadong Engineering Corporation
University of Chinese Academy of Sciences
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining & Technology
College of Mining and Safety Engineering, Shandong University of Science and Technology
State Key Laboratory of Mining Disaster Prevention and Control Co-founded by Shandong Province and the Ministry of Science and Technology, Shandong University of Science and Technology