Optimal analysis of construction schemes of small space tunnel with bidirectional eight traffic lanes in jointed rock mass
|更新时间:2026-06-25
|
Optimal analysis of construction schemes of small space tunnel with bidirectional eight traffic lanes in jointed rock mass
Vol. 33, Issue 3, (2012)
作者机构:
1. 同济大学 地下建筑与工程系 岩土及地下工程教育部重点实验室,上海,200092
2. 大连市政设计研究院有限责任公司,辽宁,大连,116001
作者简介:
基金信息:
DOI:
CLC:U455
Online First:12 March 2012,
Published:2012
稿件说明:
移动端阅览
JIANG Kun, XIA Cai-chu, BIAN Yue-wei. Optimal analysis of construction schemes of small space tunnel with bidirectional eight traffic lanes in jointed rock mass[J]. 2012, 33(3).
DOI:
JIANG Kun, XIA Cai-chu, BIAN Yue-wei. Optimal analysis of construction schemes of small space tunnel with bidirectional eight traffic lanes in jointed rock mass[J]. 2012, 33(3).DOI:
Optimal analysis of construction schemes of small space tunnel with bidirectional eight traffic lanes in jointed rock mass
According to the construction conditions of Kuiqi No.2 small-space tunnel with super-large cross-section and eight traffic lanes in the second phase project of Fuzhou International Airport Highway
a discrete element analysis program is established to simulate the construction process. In the program
the double-heading construction method
CRD method and CD method have been simulated. The settlements of vault
horizontal deformations of middle rock pillar
horizontal deformations of surrounding rock and plastic zone of surrounding rock are analyzed and the advantages of the three methods are compared. Considering the characteristics of Kuiqi No.2 Tunnel
the practical construction scheme is optimized. The double-heading method is changed to CRD method at the tunnel entrance. The modification of construction method has great contribution to cut down the cost and to reduce erection time. The results provide some reasonable references to design and construction for similar engineering.